Project consist of recovering the existing roof with a new 60mil TPO membrane while leaving the existing roof membrane in place. Work consists of preparation of the existing membrane installation of 1/4" coverboard along with 60mil TPO mechanically attached. Existing rooftop elements are to remain in place and be properly flashed and waterproofed as part of the completed roof assembly.